![]() |
|
|
RecommendationsCommissioningDevelop a commissioning plan that includes the items listed above. After construction or renovation provide a minimum flush-out period of two weeks prior to occupancy. Re-commission buildings periodically. Building use shall be taken into account when determining the re-commissioning schedule.
|